104 Chapter 6 | FINDINGS - SABAH these programmes. Neither have these land development programmes been planned with any in-depth study on the needs and requirements of indigenous peoples. The Inquiry also found that these programmes do not have any in-built periodic assessments or programme reviews, and neither are measures put in place if projects have drawbacks. In addition to this EIAs were viewed as feasibility studies, when in fact, EIAs are conducted for a project to be approved. Feasibility Studies prior to commencement of development should be conducted at the planning stage and not before a project is approved. 6.137 Currently there is no policy on restitution of NCR (untitled) land that is taken for development, including for private interests, or protected areas as long as they are considered for “public purpose”. Indigenous peoples informed the Inquiry that they were not satisfied with the quantum of compensation which to them was not just, fair or equitable. 6.138 The research conducted for the Inquiry on Sabah’s land policy shows that native rights to land have eroded with each successive change of Governments. The research also revealed that despite current positive provisions in the Sabah Land Utilisation Policy 2010, there are numerous gaps in the land use policy relating to natives, including the policy that all untitled lands are State Land. 6.139 The Inquiry is concerned that individual applications for land will no longer be entertained or given priority. This administrative change is based on the Lands and Surveys Department’s observation that natives would sell their land once they obtained their native title documents. While there is some truth in this, the Inquiry also heard about incidences of fraud where many natives were unwittingly tricked into selling their lands or where they had to sell their land for various reasons linked to poverty. 6.140 The Inquiry also found that policies on land development schemes relating to poverty eradication can become serious constraints which could impede the full enjoyment of natives’ rights to land in accordance with their needs and requirements. The Sabah Economic Development Investment authority (SEDIA), the State investment arm, together with the Sabah Rural Development Ministry, have initiated several in-situ land development schemes to assist hard-core poor. However, projects that involve NCR land that has been developed and applied for by local communities and the vesting of this land in a development company, could in fact render these “non-hard-core poor” poorer. Administrative Constraints 6.141 Research on the historical evolution of land administration from pre-colonial times to the present era has shown that land administrators no longer play a proactive role in promoting and protecting indigenous peoples’ rights to land.263 There are numerous records of British land administrators arguing for NCR to be upheld and the implementation of native land settlements. Current land administrators admitted to the Inquiry that they had to promote the development agenda of the Government and they were not in a position to propose policies to the Government. 6.142 The role of the village leaders like the ketua kampung in relation to NCR lands has been reduced over the years as they are no longer required to verify any land applications or accompany surveyors when conducting surveys in their village. The selection of the Ketua 263 Dolittle, Amity. 2011. Native Customary Land Rights in Sabah, Malaysia 1881-2010. http://www.forestpeoples.org/sites/fpp/files/ publication/2011/11/divers-paths-justice-cover.pdf chapter 6_a4.indd 104 7/5/13 6:47 PM

Выберите целевой абзац3

Подключиться к абзацу
Connect to an entity
Disable highlights
Добавить в оглавление