transported to the poorly-designed storage trenches in Lanyu6 for temporary storage and supposedly for subsequent ocean disposal. The London Convention which became effective in 1975 already banned all countries from dumping nuclear waste into the sea, but Taipower still continued to transport nuclear waste to such sites for temporary storage. Over the years, the quantity of waste has reached more than a hundred thousand barrels. The waste barrel storage trench on Lanyu has exceeded its useful lifetime as originally designed, the corrosion of the storage barrels is severe, and relevant inspection operations have not been properly performed, such that the physical and mental health of local residents in Lanyu has been in danger for a long period of time. After investigation and followup by the Control Yuan, the Executive Yuan established the Guideline for Compensation for Use of Indigenous Peoples’ Reservation Land at the Nuclear Waste Lanyu Storage Site on October 18, 2019, in order to compensate the residents in Lanyu. In addition, Taiwan Power Company will complete the re-packaging operation of all the low-level radioactive waste barrels completely by April 2021. (2) The government must supervise Taiwan Power Company to perform by itself or entrust operators with the technical capability for final radioactive waste disposal in order to be responsible for effectively compressing the quantity and volume of radioactive waste, and to assist various radiation monitoring and environmental survey works in the region of Lanyu, thereby fulfilling the responsibility of protecting the health of the local residents and properly handling the Lanyu nuclear waste storage site. If so, the trust of the general public can be recovered, and the successful launch of the final disposal plan can be facilitated. 241. Lanyu residents’ health examination and medical resource status: To fulfill indigenous peoples’ historical justice and transitional justice, the Executive Yuan has in October 2016 already established the truth investigation team for the Lanyu nuclear waste storage site.And to protect the rights and interests of Lanyu residents, the Lanyu Health Examination Project Plan was approved on July 24, 2018; however, the MOEA and MOHW did not start the health examination operations until November 14 of the same year. Up to December 6 of the same year, only 249 people had completed the examination, reaching a completion rate of less than 5%, which was far different from the plan which anticipated completing the examinations by the end of 2018. After the tracking of the improvement status by the Control Yuan, the Executive Yuan reestablished the Lanyu Resident Health Examination Project Compensation Plan on July 24, 2018, and up to the end of August 2019, there were a total of 2,490 people who had completed the health examination, though the completion rate was still only approximately 50%. 6 Lanyu is also known as Orchid Island, a small volcanic island 64 km. off the southeast coast of Taiwan. 116

Выберите целевой абзац3

Подключиться к абзацу
Connect to an entity
Disable highlights
Добавить в оглавление