quarters households and the social, economic, and cultural value of such
quarters, even allowing the original households to settle in the preserved
quarters as a priority, thereby protecting the living rights of the quarters’
households as well as reducing civil complaints and protests.
233. Delay of Shezidao Development
(1) After Shezidao was in 1970 zoned as an area in which further construction
was banned,5 the use of its land was significantly restricted; some of the
population also moved off of the island, and its overall development was
clearly stopped, leading to obvious signs of decay and decline. As no detailed
plan has been announced for Shezidao, the area lacks the fundamental
construction of roads, utilities and common pipelines. There are no pipes for
sanitary removal of sewage, and so it is the most backward area in Taipei city
in terms of infrastructure.
(2) Paragraph 2 of Article 4 of the Regulations for Zone Expropriation
Implementation specifies that those requesting the land use should, before
the review and approval of the Urban Planning Commission of the Ministry
of Interior (MOI), report to the Land Expropriation Review Team of the
Ministry to explain the public interest and necessity for the use of the land.
However, for Shezidao, it is planned to use the zone expropriation method to
carry out the overall development of the whole area at one time. With regard
to whether the MOI has reviewed and satisfied the public interest and
necessity for such use, the Taipei City government and the MOI have made
different statements, indicating that the review procedure of the
expropriation of such area is unclear, and it is likely to cause troubles and
misunderstanding to the entity requesting the use of the land and the residents
in the area.
(3) Regarding the Taipei City Shilin District Shezidao Regional Development
Plan organized by the Taipei City Government, as for the planning of the
developmental direction of Shezidao, it has not sufficiently discussed the
plan with the local residents and sought their opinions before the proposal of
the plan, such that the operational procedure for development is clearly
inadequate. In addition, to comprehensively survey the local social and
economic status of Shezidao residents and to understand the resettlement
needs of the residents for the planned expropriation to be implemented, the
city government carried out a survey of households to find out the response
to the Shezidao resettlement plan and their willingness to relocate. The
household survey was performed based on the assumption that the Shezidao
residents had understood the necessary resettlement after the land
5
This ban was set because Shezidao is a low sandbar about 3 kilometers long at the confluence of large rivers that
drain the Taipei basin, and so subject to serious flooding of the existing villages; but with land at a premium in the
metropolitan area, it has for decades been under pressure for development.