Native Title Part 2
Future acts etc. and native title Division 3
Section 26D
(b) if at the end of 90 days, or such longer period as the
Commonwealth Minister allows, after doing so, the
conditions in this section would still not be satisfied—by
legislative instrument, revoke the determination.
26D Excluded mining acts: earlier valid acts
Renewal of valid mining lease etc.
(1) This Subdivision does not apply to an act consisting of the creation
of a right to mine if:
(a) the creation of the right is done by:
(i) the renewal; or
(ii) the re-grant or re-making; or
(iii) the extension of the term;
of an earlier right to mine; and
(b) the earlier right:
(i) was created on or before 23 December 1996 by an act
that is valid (including because of Division 2 or 2A); or
(ii) was created by an act to which this Subdivision applied
that was not invalid to any extent under section 28; and
(c) the area to which the earlier right relates is not extended; and
(d) the term of the right is not longer than the term of the earlier
right; and
(e) no rights are created in connection with the right that were
not created in connection with the earlier right.
Act contemplated by exploration or prospecting agreement etc.
(2) This Subdivision does not apply to an act (the later act) consisting
of the creation of a right to mine if:
(a) before the later act takes place, an act (the earlier act)
consisting of the creation of a right to explore or prospect
took place; and
(aa) the earlier act took place after the commencement of this
section; and
Compilation No. 47
Native Title Act 1993
129
Compilation date: 25/09/2021
Registered: 22/10/2021
Authorised Version C2021C00450 registered 22/10/2021