of these wastes is high. In the Kingdom of Bahrain, the daily waste production per capita
is approximately (1.5) kg /person /day, which is high compared to the global average of
(1.2) kg /person /day(20).
25. According to the same Review, since 1986, waste is being disposed of in Askar landfill site,
which is a rock quarry in the southeast of the Kingdom, in which waste is buried, compacted with
heavy machinery, and covered with a layer of sand, without any sorting, treatment or recycling
processes.
26. Accordingly, the NIHR is concerned about the rise in the generation of all types of waste and its
harmful impact on the environment, especially with the increase in the per capita share compared
to the global average daily waste production per capita. The amount of non-hazardous waste
received at the landfill is approximately 1,700,000 tons annually, of which approximately (38%)
is construction waste, which is equivalent to (646) thousand tons, and (22%) is industrial waste,
which is equivalent to (374) thousand tons, and (33%) is household waste, which is equivalent
to (561) thousand tons, and (7%) is green waste, equivalent to (119) thousand tons(21).
27. Concerning the Government’s action plan to deal with this increase in the quantity of generated
waste, the National Waste Management Strategy has (8) projects that will, in total, cause
a reduction in the amount of waste received at the landfill site to a minimum, handle it in
an environmentally sound manner, and make the maximum possible utilization of the waste
according to the best available practices(22). Once these projects are implemented, more than
(45%) of the total quantity of waste received at the landfill site will be treated(23).
28. The first project of the National Waste Management Strategy aims to recycle construction and
demolition waste, which comprises around (38%) of the total waste, by crushing, separating
and converting it into materials usable in infrastructure projects. Actual work on this project
has commenced by allocating an area in Hafira landfill area in the Southern Governorate, the
recycling operations were carried out and the recycled materials were used.
29. The second project aims to recycle green waste, which comprises approximately (7%) of the total
waste, by converting it into fertilizers to be used by the agricultural sector. The pilot phase of this
project has commenced by allocating an area of (5) thousand square meters in the Horat A’ali
area, where 10 tons of agricultural waste is received at the site and converted into fertilizers.
Once the operational phase of this project commences, the project area will reach (30) thousand
square meters for the complete conversion of green waste and utilizing it in the agricultural sector.
(20) T he Kingdom of Bahrain’s First National Voluntary Review on SDG’s 2030, submitted to the High-level Political Forum on Sustainable Development Goals in New York,
July 2018, p.85
(21) A
n interview with His Excellency the Minister of Works, Municipalities Affairs and Urban Planning, published in Al-Ayyam newspaper, Issue No. (11051), on 14 July
2019.
(22) R esponse of His Excellency the Minister of Works, Municipalities Affairs and Urban Planning on the question from a member of the Shura Council regarding the annual
quantity of waste generated from the various activities; published in Al Watan newspaper, Issue No. (4853), on 25 March 2019.
(23) A
n interview with His Excellency the Minister of Works, Municipalities Affairs and Urban Planning, published in Al-Ayyam newspaper, Issue No. (11051), on 14 July
2019.
109
Выберите целевой абзац3
Подключиться к абзацу
Connect to an entity
Disable highlights
Добавить в оглавление