100 Chapter 6 | FINDINGS - SABAH villages. Both communities have protested against the construction of the dams and initiated several dialogues with the authorities. However to date, no clear decision has been taken to stop the said construction or to hold proper consultations. 6.111 In case no P34, Mr Edgardo Apines (W100), chief engineer of the Sabah Water Supply Department said that after the Infrastructure Development Ministry appointed WCT Sdn Bhd to conduct a feasibility study on the Kaiduan dam, the same company presented their assessment on the projected water supply needs for Kota Kinabalu. No independent study about actual water supply needs was done by the Ministry and alternatives to the Kaiduan Dam which were presented by the communities were not considered. 6.112 WCT Sdn Bhd Project Director, Mr Mohd Roslan Sarip (W98) admitted mistakes on initial information regarding the number of affected villages. After receiving complaints that the SEIA study was not conducted properly and did not comply with the Sabah EIA Guideline, W100 said that it was in the process of re-appointing another consultant. 6.113 In case P51 on the proposed Tambotuon, Mr Imus bin Onsiang (W59), a representative of the State Agriculture Department informed the Inquiry that the proposed Tambatuon Dam is under the Federal Ministry of Agriculture and Agro-Based Industry. The final draft report of the preliminary EIA was completed in January 2011 where it outlined positive and negative impacts of the dam. W59 added that State departments were not involved in the EIA and he could not confirm whether the federal Government consultant organised a consultation with the community. vii. Compensation from Land Acquisition 6.114 The Inquiry recorded six statements under this category on compensation. The issues include acquisition of native title (NT) land for development purposes where the procedure to claim compensation usually took a long time and in some cases, compensation went unpaid. Apart from procedures, many also complained about the meagre amount of compensation for NTs under the Land Acquisition Ordinance which is based on an outdated system of crop valuation that does not take into consideration the loss of revenue or loss of communal life. There is also no procedure under the Ordinance for a pre-acquisition hearing. 6.115 Currently, there are no provisions in any law to compensate NCR land even though section 66 of the SLO deems land under customary tenure as permanent, heritable and transferable. Natives affected by reservation of lands over their NCR land – whether for development under section 28 of the SLO or various sections in other enactments for the purpose of conservation are seldom paid compensation. The Inquiry finds that the failure of the LSD to serve a notice under section 13, or invoking sections 80, 81 and 82 of the SLO on settlement of NCR claims amount to infringement of right to property as enshrined in Article 13 of the Federal Constitution. 6.116 Acquisition for land under section 28 of the SLO, particularly for MESEJ and Agropolitan projects, is not likely to be compensated. In the Bakong-Bakong MESEJ project in case no TW26, Tuan Haji Jilis Hj Ismail (W69) of the Sabah Land Development Board, said it was very rare for compensation to be paid for land taken under this section. There is also no possibility for perennial crops such as rubber and fruit trees to be paid compensation if these are cut down in the clearing process. From the cases heard by the Inquiry, the process of gazetting land for “public purpose” under Section 28 also does not enquire into the existence of NCR claims. chapter 6_a4.indd 100 7/5/13 6:47 PM

Выберите целевой абзац3

Подключиться к абзацу
Connect to an entity
Disable highlights
Добавить в оглавление