104
Chapter 6 | FINDINGS - SABAH
these programmes. Neither have these land development programmes been planned with
any in-depth study on the needs and requirements of indigenous peoples. The Inquiry also
found that these programmes do not have any in-built periodic assessments or programme
reviews, and neither are measures put in place if projects have drawbacks. In addition to this
EIAs were viewed as feasibility studies, when in fact, EIAs are conducted for a project to be
approved. Feasibility Studies prior to commencement of development should be conducted
at the planning stage and not before a project is approved.
6.137 Currently there is no policy on restitution of NCR (untitled) land that is taken for development,
including for private interests, or protected areas as long as they are considered for “public
purpose”. Indigenous peoples informed the Inquiry that they were not satisfied with the
quantum of compensation which to them was not just, fair or equitable.
6.138 The research conducted for the Inquiry on Sabah’s land policy shows that native rights to
land have eroded with each successive change of Governments. The research also revealed
that despite current positive provisions in the Sabah Land Utilisation Policy 2010, there are
numerous gaps in the land use policy relating to natives, including the policy that all untitled
lands are State Land.
6.139 The Inquiry is concerned that individual applications for land will no longer be entertained or
given priority. This administrative change is based on the Lands and Surveys Department’s
observation that natives would sell their land once they obtained their native title documents.
While there is some truth in this, the Inquiry also heard about incidences of fraud where
many natives were unwittingly tricked into selling their lands or where they had to sell their
land for various reasons linked to poverty.
6.140 The Inquiry also found that policies on land development schemes relating to poverty eradication
can become serious constraints which could impede the full enjoyment of natives’ rights to
land in accordance with their needs and requirements. The Sabah Economic Development
Investment authority (SEDIA), the State investment arm, together with the Sabah Rural
Development Ministry, have initiated several in-situ land development schemes to assist
hard-core poor. However, projects that involve NCR land that has been developed and applied
for by local communities and the vesting of this land in a development company, could in
fact render these “non-hard-core poor” poorer.
Administrative Constraints
6.141 Research on the historical evolution of land administration from pre-colonial times to the
present era has shown that land administrators no longer play a proactive role in promoting
and protecting indigenous peoples’ rights to land.263 There are numerous records of British
land administrators arguing for NCR to be upheld and the implementation of native land
settlements. Current land administrators admitted to the Inquiry that they had to promote
the development agenda of the Government and they were not in a position to propose
policies to the Government.
6.142 The role of the village leaders like the ketua kampung in relation to NCR lands has been
reduced over the years as they are no longer required to verify any land applications or
accompany surveyors when conducting surveys in their village. The selection of the Ketua
263 Dolittle, Amity. 2011. Native Customary Land Rights in Sabah, Malaysia 1881-2010. http://www.forestpeoples.org/sites/fpp/files/
publication/2011/11/divers-paths-justice-cover.pdf
chapter 6_a4.indd 104
7/5/13 6:47 PM
اختر الفقرة المستهدفة3
الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات