(iii) Pakuria (Kushtia-Nadia) area
The boundary shall be drawn from existing
Boundary Pillar No. 151/1-S to Boundary Pillar No.
152/2-S to follow the edge of River Mathabanga as
jointly surveyed and agreed in June, 2011.
(iv) Char Mahishkundi (Kushtia-Nadia) area
The boundary shall be drawn from existing
Boundary Pillar No. 153/1-S to Boundary Pillar No.
153/9-S to follow the edge of River Mathabanga as
jointly surveyed and agreed in June, 2011.
(v)
Haripal/Khutadah/Battoli/Sapameri/LNpur
(Patari) (Naogaon-Malda) area
The boundary shall be drawn as line joining
from existing Boundary Pillar No. 242/S/13, to
Boundary Pillar No. 243/7-S/5 and as jointly
surveyed and agreed in June, 2011.
(vi) Berubari (Panchagarh-Jalpaiguri area)
The boundary in the area Berubari
(Panchagarh-Jalpaiguri)
adversely
held
by
Bangladesh, and Berubari and Singhapara-Khudipara
(Panchagarh-Jalpaiguri), adversely held by India shall
be drawn as jointly demarcated during 1996-1998.
(b) Meghalaya Sector
(i) Lobachera-Nuncherra
The boundary from existing Boundary Pillar
No. 1315/4-S to Boundary Pillar No. 1315/15-S in
Lailong - Balichera, Boundary Pillar No. 1316/1-S to
Boundary Pillar No. 1316/11-S in Lailong- Noonchera,
Boundary Pillar No. 1317 to Boundary Pillar No.
1317/13-S in Lailong- Lahiling and Boundary Pillar
No. 1318/1-S to Boundary Pillar No. 1318/2-S in
Lailong- Lobhachera shall be drawn to follow the edge
of tea gardens as jointly surveyed and agreed in
December, 2010.
387
اختر الفقرة المستهدفة3
الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات