Residents noted that they were not informed about the amortisation arrangements during the consultations with the NHA and LGU, only learning of this at an orientation once they arrived at the site. Although residents understood that they had to pay for their interest in the resettlement site, they were unaware of the detail of this interest, in particular the restriction on transferring or leasing their interest to others. Some older residents were concerned about their outstanding debts under the agreement being automatically transferred to their children after their deaths. At this point residents were required to sign the amortisation agreement, but were not provided a copy, and noted that they were unable to read the entire agreement in the time available for them to sign. Residents were only given a stub indicating their house and lot number, with the NHA advising at this stage that if occupants lost this stub then they would lose their entitlements to the property. Residents have since requested copies of their amortisation agreements, but were allegedly told that these would only be available upon the conclusion of their 25-year amortisation period. Residents expressed concern that they have no record of their legal interest in the site and are afraid of potential threats to their living conditions and security of tenure. Residents noted that when they arrived at the site some units were not finished, with some bathrooms lacking toilet bowls. These were installed by residents themselves, where possible. The community was initially serviced with electricity by temporary generators between 6pm and 6am, but has since obtained direct household connection through the electricity company. There is still no household water connection in the community and residents purchase buckets of water from neighbouring barangays. Residents reported that the NHA is generally available to conduct repairs to properties at short notice and have been largely satisfied with this aspect of resettlement. Day care, elementary and high schools are all available in the site and operational, with most school-aged children attending formal education. The community also has a barangay health centre, with a community doctor every Friday. There is no hospital in Gaya-Gaya, although a municipal hospital is located in the vicinity and can be reached by tricycle at a cost of PHP18. Residents reported livelihood to be their main concern in Gaya-Gaya, with a shortage of employment opportunities in the surrounding area. Most residents are jobless, with some having disposed of their houses to return to live in Navotas where they have regular employment. Many still travel back to Navotas daily to work, which takes approximately 2 hours each way with four changes on public transport, at a cost of PHP200 per day. Residents earning a minimum wage of PHP465 per day are therefore required to spend nearly half of their income on transport. Residents reported that daily commuting is still more economical than renting an additional room in Navotas, which can cost upwards of PHP3,000 per month. Some residents who work back in Metro Manila in the construction industry have resorted to sleeping on construction sites to save money. Residents reported feeling generally safer in the resettlement site, being separated from the regular threats of flooding they experienced in Navotas, and having access to good education facilities for their children. However, they remain concerned with the lack of economic opportunities, which for some has made their residence in Gaya-Gaya unsustainable. 99

اختر الفقرة المستهدفة3

الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات