11. Suo Motu Cognizance Pertaining to Existing Bonded Labour in Mirzapur and Varanasi Districts of Uttar Pradesh (Case no. 10928/24/72/2014-BL) 9.59 The Commission took suo motu cognizance on 3 April 2014 based on the report of Joint Registrar (Law) of the Commission, wherein it was stated that on the way to Chunar, a large number of brick kilns on both the sides of the road (Varanasi-Mirzapur Highway) were functional. It was observed that a large number of children, women along with men were working in these brick kilns. On inquiry, it was revealed that most of the workers were from the State of Chhattisgarh and Jharkhand. It was also informed that these workers lived in pathetic conditions and there is no effective control of Government machinery over them. No raids reportedly, were being conducted by the State machinery due to terror of mafia. The Commission, therefore, directed the District Magistrate, Varanasi and District Magistrate, Mirzapur to submit their respective reports. 9.60 According to the reports there were about 250 brick kilns operating in the Varanasi range but there was no mechanism under the Labour Dept of Uttar Pradesh to verify as to how many units were operating under valid licenses. Therefore the Labour Dept had no authentic information about the same. This is because issuance of licenses to the brick kiln owners is not under the control of the said Dept. Similarly details of the total number of labourers engaged in the brick kilns (including males, females& children) were also not available with the Labour Dept. Since the owners of the bricks kiln are not liable to submit the same before the Labour Dept, similar is the problem with respect to the categories of communities of the labourers such as SCs, STs, OBCs, etc. to which they belonged. 9.61 The Commission further considered the matter on 25 November 2014 when it observed and directed as under:“The report has not answered the required information on special points as called for. No information is given whether the released labourers have been rehabilitated or not with details. It is to be noted that the DM is the appropriate authority specified u/s 10 of the provision of the Bonded Labour System (Abolition) Act, 1976 for implementing the provisions of the Act. Further he is the Chairman of the Dist. Vigilance Committee and he is obliged to obtain all the reports as required by the law and he is required to perform his function in terms of Sec. 14 of the said Act. He has been entrusted with the powers to instruct the vigilance committees to ensure that brick kilns operate as per the mandate of law and comply all the statutory requirements. The report seems to have not been prepared as required. The DMs of Varanasi & Mirzapur are directed to submit their reports strictly as per the direction of the Commission. Reply within 8 weeks positively.” 166 National Human Right Commission Annual Report - 2014-2015

اختر الفقرة المستهدفة3

الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات