when raining. Triage room does not meet the standards and it is placed in
unsuitable area which is the dining hall of IPD.
iv) IPD Kuching
6.12 The building was built in 1931 and currently it is located 14km from downtown.
The location of IPD is next to Merdeka Plaza and due to construction of the
Plaza, the septic tank is always filled up with water when it rains and it gets
ruptured. This eventually affects the piping system of lock-up and station. The
piping system is also seen unsuitable to accommodate current condition. The
air-conditioning system is not well-maintained as sometimes it is broken and
this makes daily tasks difficultbecause of the congested ventilation due to old
structure of the building.
v) IPD Shah Alam
6.13 During the visit, air-conditioners in all IPD have beenbroken since the last two
months. Although it has been informed to logistics department, no immediate
action is taken to overcome the problem. This causes inconvenience to all IPD
members and the complainants.Out of three lifts, two of them are also broken
and not well-maintained which cause difficulty when going up and down the
building.
vi) Travers Police Station, IPD Brickfields
6.14 No lift maintenaince was carried out. Lift button is broken and it creates
inconvenience for those who use the facility (Figure 44). Travers Police Station
lock-up which is newly built cannot be used as it does not meet the safety
standards by Fireand Rescue Department (Bomba) although it is equipped with
facilities.
118
اختر الفقرة المستهدفة3
الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات