Hyderabad Metro Water Supply and Sewerage (HMWS&S) Department. In lieu of
a piece of land made available by IMH to HMWS&S for construction of their
reservoir the HMWS&S had ensured 24 hours supply of portable water to the
hospital. Water samples had been drawn regularly at appropriate intervals and
sent to the Institute of Preventive Medicine Hyderabad for testing and certification
and no adverse remarks had been received by the Institute.
Geysers and solar heaters had been installed in all the wards to ensure supply
of hot water for inmates in winter. Water coolers had also been provided in some
parts of the hospital to ensure supply of cool potable water in summer months.
Government Hospital for Mental Care (GHMC), Vishakhapatnam (30th and
31st March, 2009)
The right of inmates to cool and potable water had been recognized and fulfilled
by the Government Hospital for Mental Care Visakhapatnam. The Municipal
Corporation of Visakhapatnam supplied nearly 2 lakh litres of fresh water to the
hospital every day. Potable water was provided to all the wards in stainless steel
containers with tumblers. Drinking water was placed at the entrance of the ward
to provide easy access to every patient. One water cooler with aqua-guard water
purifier had been provided in the family ward block. Proposals for purchase of 3
more water coolers with aqua-guards had already been sent to Government for
providing cool drinking water in every block.
Institute of Human Behaviour and Allied Sciences (IHBAS), Shahdara (13th
August, 2010)
The adequate quantity of potable and non-potable water was available both at the
source, storage as well as distribution point. The drinking water being treated
through RO Plant was free from all bacteriological and chemical impurities. The
Over Head tanks (both main and sub tanks) had been cleaned at specified
intervals. There was a provision for supply of hot water for bath of inmates in
winter. Water coolers had also been installed for supply of cool water in summer
months.
Hospital for Mental Health (HMH), Ahmedabad (20th August, 2010)
There was no scarcity of water as the hospital had its own bore-well and two
overhead water tanks and one sump with capacity of one lakh litres each. There
were 12 sub tanks with a storage capacity of 10,000 litres each and each hospital
building (including wards) had a separate overhead tank. The cleaning of the
main overhead tank was done once in every 3 months and that of sub tanks and
sump every month. The samples of water were regularly drawn and sent for test
at the Ahmedabad District Laboratory of Gujarat Water Supply and Sewerage
Board. The water so tested had confirmed that it was potable (free from chemical
and bacteriological impurities). All wards were having water coolers with RO
systems for drinking water.
Care and Treatment in Mental Health Institutions– Some Glimpses in the Recent Period
85