spending on an average 5 to 10 minutes on old cases and 30 minutes to 1 hour
on new cases depending on the peculiarity and complexity of the cases.
The record room of GMA was too small and congested. Even a small mental
health hospital at Dharwad had a better record room in terms of space, number
of racks and the meticulous manner in which records were maintained. Counselling
at the time of registration, examination of patients by MOs and at the time of drug
dispensing had not received the desired attention. The IEC material was
conspicuous by its absence in the waiting hall, MOs rooms and drug dispensing
room etc.
GMA had been providing various investigation facilities absolutely free for BPL
patients and rates of charges from others depended on their respective income
slab. GMA had the facility of administering modified ECT but the size of ECT
room and recovery room was very small and these rooms were not air conditioned.
The hospital also had X-Ray and ECG facility. The EEG machine was lying out
of order and there was no EEG technician. The tests undertaken in the
pathological laboratory of GMA included routine blood and urine examination;
serum lithium examination; blood urea, blood sugar, widal test; serum creatinine,
uric acid and rheumatoid factor. A separate laboratory for conducting psychological
tests was established in the OPD in 2010 and psychological tests conducted in
the psychological laboratory were 34.
GMA had been recommending the cases of BPL patients for free railway passes
and their relatives for 50 per cent concessional rail fare tickets for five years. The
State Government, however, had no such policy for providing concessional bus
fare to patients and their relatives.
Suggestions
·
The proposal for procurement and installation of a new EEG and creation
and filling up of the post of EEG technician should be placed before the MC
for its approval without any further delay.
·
The ECT room and recovery room needs to be made air conditioned as the
temperature shoots up to 45 degree to 46 degree Celsius in summer
months in Gwalior.
Institute of Mental Health (IMH), Cuttack (4th and 5th July, 2011)
The CPWD with an amount of Rs.1.51 crores provided as grant-in-aid by the
Government of India had remodelled the old OPD and administration-cum
Seminar block to a modern OPD complex. The renovated OPD complex had
entrance veranda (open); OPD waiting hall with 176 chairs and a raised platform
so that the same could be used for conference on non OPD dates; May I help
you counter; 2 registration counters; Chamber for data entry operator; Drug
dispensing unit (old registration counter of OPD has been converted to a drug
dispensing unit) for the time being; Psychiatrist room, Consultant’s duty room,
Care and Treatment in Mental Health Institutions– Some Glimpses in the Recent Period
49