The hospital had constructed sheds with asbestos sheets to accommodate 50
OPD patients/family members. The construction of new OPD building and 30
bedded female family ward was likely to be completed in 3 months’ time. The
construction of separate boundary wall between IPD (female) and new OPD and
Family ward and construction of a road in OPD and male IPD had also been
completed. The construction of 50 bedded Male Ward and modular kitchen was
likely to begin shortly. The deadline for the completion and handing over physical
possession of OPD and Family wards was December, 2010 and IPD male ward
was January, 2011.
The new OPD Block included registration room; 7 MO’s rooms with attached
toilet; waiting hall with a capacity to accommodate 50 patients/ relatives with 6
attached toilets and 4 Verandas with length of 14 metre and width of 3.5 metre
with a capacity to accommodate 50 patients; The drug dispensing unit with
attached store room; pathological laboratory with platform and provision for wash
basin; ECT room with no recovery room; X-ray room including a dark room and
a technician room and the courtyard of 13.45 metre x 15.15 metre to be
developed into a garden in consultation with U.P. Horticulture Department. The
quality of construction of new blocks was not up to the mark due to substandard
bricks, brick work as well as joinery work and poor supervision. The paved drive
ways had developed cracks due to poor quality of execution.
Suggestions
·
The Mental Hospital Varanasi needs to make provision for recovery room;
central store room for storing medicines; central record room; room for
clinical psychologist; room for psychiatric social worker; seminar room for
inter departmental consultations; conference hall; library; geriatric ward;
child guidance clinic and central store room for storing food grains,
vegetables, fruits etc. The authorities of Mental Hospital Varanasi may plan
these basic components of physical infrastructure, prepare estimates of
cost and get that approved by Government and take up the construction
work in a phased manner depending on allocation of funds. Keeping in view
the need for round the clock vigilance and surveillance and special care
and attention for mentally ill persons Mental Hospital Varanasi should take
up a phased programme for construction of additional staff quarters. The
Mental Hospital Varanasi being old requires constant vigilance and timely
repair to avoid any untoward incidents like collapse of structures. It may be
desirable to prepare all repair estimates, get administrative approval/
technical sanction for them and carry out the repairs.
Institute of Mental Health and Hospital (IMHH), Agra (28th March to 30th
March, 2011)
The IMHH, Agra had a total land area of 172.84 acres, of which 33 acres was
farm land and around 30 acres lied outside the boundary wall and patches of the