(ii)
Pyrdiwah/ Padua Area
The boundary shall be drawn from existing
Boundary Pillar No. 1270/1-S as per jointly surveyed
and mutually agreed line till Boundary Pillar No.
1271/1-T. The Parties agree that the Indian Nationals
from Pyrdiwah village shall be allowed to draw water
from Piyang River near point No. 6 of the agreed
Map.
(iii) Lyngkhat Area
(aa) Lyngkhat-I/Kulumcherra
Lyngkhat-II/ Kulumcherra
and
The boundary shall be drawn from
existing Boundary Pillar No. 1264/4-S to
Boundary Pillar No. 1265 and BP No. 1265/6-S to
1265/9-S as per jointly surveyed and mutually
agreed line.
(ab)
Lyngkhat-III/Sonarhat
The boundary shall be drawn from
existing Boundary Pillar No. 1266/13-S along
the nallah southwards till it meets another
nallah in the east-west direction, thereafter it
shall run along the northern edge of the nallah in
east till it meets the existing International
Boundary north of Reference Pillar
Nos.1267/4-R-B and 1267/3-R-I.
(iv) Dawki/Tamabil area
The boundary shall be drawn by a straight line
joining existing Boundary Pillar Nos. 1275/1-S to
Boundary Pillar Nos. 1275/7-S. The Parties agree to
fencing on ‘zero line’ in this area.
388
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents