(iii) Pakuria (Kushtia-Nadia) area
The boundary shall be drawn from existing
Boundary Pillar No. 151/1-S to Boundary Pillar No.
152/2-S to follow the edge of River Mathabanga as
jointly surveyed and agreed in June, 2011.
(iv) Char Mahishkundi (Kushtia-Nadia) area
The boundary shall be drawn from existing
Boundary Pillar No. 153/1-S to Boundary Pillar No.
153/9-S to follow the edge of River Mathabanga as
jointly surveyed and agreed in June, 2011.
(v)
Haripal/Khutadah/Battoli/Sapameri/LNpur
(Patari) (Naogaon-Malda) area
The boundary shall be drawn as line joining
from existing Boundary Pillar No. 242/S/13, to
Boundary Pillar No. 243/7-S/5 and as jointly
surveyed and agreed in June, 2011.
(vi) Berubari (Panchagarh-Jalpaiguri area)
The boundary in the area Berubari
(Panchagarh-Jalpaiguri)
adversely
held
by
Bangladesh, and Berubari and Singhapara-Khudipara
(Panchagarh-Jalpaiguri), adversely held by India shall
be drawn as jointly demarcated during 1996-1998.
(b) Meghalaya Sector
(i) Lobachera-Nuncherra
The boundary from existing Boundary Pillar
No. 1315/4-S to Boundary Pillar No. 1315/15-S in
Lailong - Balichera, Boundary Pillar No. 1316/1-S to
Boundary Pillar No. 1316/11-S in Lailong- Noonchera,
Boundary Pillar No. 1317 to Boundary Pillar No.
1317/13-S in Lailong- Lahiling and Boundary Pillar
No. 1318/1-S to Boundary Pillar No. 1318/2-S in
Lailong- Lobhachera shall be drawn to follow the edge
of tea gardens as jointly surveyed and agreed in
December, 2010.
387
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents