Residents were required to sign an amortisation agreement to have access to the
allotted house and lot in the site. Copies of the agreement were not provided to
residents and could only be reviewed in the NHA office upon payment of a PHP300
fee. Residents advised that the contracts were in English and Tagalog, but they were
unable to understand many of the details of the agreement.
LEF T: THE
ENTR ANC E TO
NORT HVI LLE 3 IN
ME YC AUAYAN
UN DER HEAV Y
F LOOD ING.
Northville 3 was
constructed on a
reclaimed lake, which
since the
establishment of the
site has begun to
resurface throughout
much of the
settlement, resulting
in permanent
flooding, particularly
at the entrance to the
community.
Upon arrival at the site, much of the basic infrastructure – such as roads and drainage –
was still under construction. The PHP50,000 was delivered in 4 tranches of PHP12,500
per tranche, paid every three months. Residents complained that this programme of
staggered fund dispensation inadvertently delayed the process of construction at the
resettlement site and caused them considerable hardship until they received the full
subsidy. Residents also advised that the timing of payments differed depending on
whether they were members of a community organisation. Those who were organised,
and able to make complaints as a group, received their tranches faster than individual
households.
Electricity was initially supplied to newly resettled households by the builder
contracted to develop the infrastructure in the site, although this was only maintained
during the resettlement period. Most residents must now illegally purchase electricity
using sub meters from private households in neighbouring barangays as there is no
electricity infrastructure at the site. A household water connection has now been