reduced the availability of staff quarters within the premises of the hospital.
The existing structures lacked architectural elegance and functional utility and
there was very little landscaping and sylvan surrounding. Though the structures
were not very old but suffered from structural deficiencies characterized by
cracks, leakage and seepage. There was excessive seepage on walls and a
number of horizontal and vertical cracks in the OPD, IPD, kitchen, dining hall and
OT rehabilitation unit.
Institute of Psychiatry and Human Behaviour (IPHB), Goa (6th to 9th
December, 2010)
A new Institute of Psychiatry and Human Behaviour (IPHB) was set up by
amalgamating the Department of Psychiatry of Goa Medical College with the
Mental Hospital at Altinho. The Institute of Psychiatric and Human Behaviour was
constructed at Bambolim at an estimated cost of Rs. 3.5 crores to provide
medical and mental health care services, teaching at undergraduate and post
graduate level and conduct training and research in Psychiatry.
The IPHB Goa had a total land area of about 70 acres and total built area of 6850
sq. meters. There was no landscaping and the vacant space was full of wild
outgrowths. The functional space of IPHB Goa included OPD waiting hall for
patients and their relatives; Consultants and Residents cabins; Registration
counter and waiting space at the registration counter; Record Room; ECG facility
in observation/emergency room; Drug dispensing unit; Modified ECT/Recovery
Room; Pathological Laboratory; Biochem laboratory; Psychological testing
laboratory; Child Guidance Clinic; 2 separate open wards for male and female
patients; 3 closed wards for female and 4 closed wards for male patients; Toilets/
bathrooms in each ward; Kitchen; Separate occupational therapy units for male
and female patients; Rest rooms for MOs, para medical staff, nursing sister in
each ward; Separate library-cum-reading rooms for faculty members and patients.
There was no proper approach road to the hospital. The main road from State
Guest House/Circuit House to the hospital (a stretch of 12 kms) was full of pot
holes and damaged at a number of points due to heavy rains. The vacant space
between the main road and the hospital had not been paved and was full of
pebbles. There was no proper parking shed for general public. There was no park
inside the hospital for relaxation of inmates of open wards and their family
members.
IPHB had taken up the work of landscaping, planting saplings suitable for the red
morrum and gravelly soil of the hospital land and developing lawns through the
office of the Dy. Conservator of Forests, Social Forestry, Parks and Gardens
Division Panda Goa and Range Forest Officer Panaji.
Suggestions
·
IPHB Goa should measure the physical space available for each functional
24
National Human Rights Commission