when raining. Triage room does not meet the standards and it is placed in unsuitable area which is the dining hall of IPD. iv) IPD Kuching 6.12 The building was built in 1931 and currently it is located 14km from downtown. The location of IPD is next to Merdeka Plaza and due to construction of the Plaza, the septic tank is always filled up with water when it rains and it gets ruptured. This eventually affects the piping system of lock-up and station. The piping system is also seen unsuitable to accommodate current condition. The air-conditioning system is not well-maintained as sometimes it is broken and this makes daily tasks difficultbecause of the congested ventilation due to old structure of the building. v) IPD Shah Alam 6.13 During the visit, air-conditioners in all IPD have beenbroken since the last two months. Although it has been informed to logistics department, no immediate action is taken to overcome the problem. This causes inconvenience to all IPD members and the complainants.Out of three lifts, two of them are also broken and not well-maintained which cause difficulty when going up and down the building. vi) Travers Police Station, IPD Brickfields 6.14 No lift maintenaince was carried out. Lift button is broken and it creates inconvenience for those who use the facility (Figure 44). Travers Police Station lock-up which is newly built cannot be used as it does not meet the safety standards by Fireand Rescue Department (Bomba) although it is equipped with facilities. 118

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents