○
○
○
○
○
Introduction
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
Economic and Social Development Plan.
○
○
Strategic Plan and the Master Plan, including the Ninth National
○
also provides how the NHRC perceives the linkage between its
○
○
was adopted by the government in October 2000. This part
○
○
gives the backgrounds and substances of the National Human
Rights Policy and Master Plan of Action (the Master Plan) which
○
○
National Human Rights Policy and Master Plan of Action
○
○
Part 6: Relation between the Strategic Plan and the
○
○
○
mechanisms to translate the Strategic Plan into actions;
○
○
Part 5: Translation into actions identifies specific
○
○
○
8 strategies;
○
���
Part 4: Strategic operation details operations under the major
○
○
○
the NHRC during the period of the Plan;
○
○
the vision, mission, goals, strategic framework and focus areas of
○
○
Part 3: Vision, mission and strategic framework explains
○
○
rights situations as well as challenges;
○
○
the overview and assessment of international and domestic human
○
○
Part 2: Human rights situations and challenges provides
○
○
○
process of the Strategic Plan;
○
○
Part 1: Introduction provides backgrounds and drafting
○
○
The Strategic Plan is divided into 6 parts as follows:
○
○
○
synthesised in the drafting process, and the NHRC adopted its
six-year Strategic Plan (2002-2007) in August 2002.
○
○
Their contribution and comments were collated and
1
7